Clear milestones, predictable timelines.
Laser/phone LiDAR, roof scan, tilt/azimuth capture and horizon mask. Shading losses measured with seasonal impact.
PVsyst yield estimate, stringing, conductor sizing, earthing & lightning protection. Structural checks for wind uplift.
We prepare and file all forms, drawings and proofs. Follow-ups handled end-to-end.
Anchors/rails fixed, panels mounted, MC4 terminations, DC/AC dressing, earthing & SPD. Safety toolbox talk daily.
IV-curve, insulation & polarity tests. Inverter config, Wi-Fi/monitoring, handover and user training.
*Approval windows vary by DISCOM and inspection backlog.




So you don’t have to chase vendors, approvals or paperwork.
Load study & ROI projection
DISCOM/CEA compliant drawings
Material logistics & site safety
Scaffold/boom as required
Monitoring app setup
AMC & cleaning plans
Short answers to common questions.
Survey and design in 1–2 days, approvals vary by DISCOM (3–10 days). On-site install is usually 1–2 days, commissioning the same day.
We use correct anchors & sealants for RCC/tile/tin. All penetrations are sealed and water-tested, with workmanship warranty.
Insulation resistance, polarity, IV-curve (where applicable), string voltages, earthing & SPD checks, and live yield verification.
Yes — owner login, alert thresholds and basic training are part of commissioning. We also offer AMC with periodic cleaning.